SWL Phase 2, Wembley

Client: McAleer & Rushe    Value: £2.7m    Design Responsibility: Full      Duration: 18 Months

 

Just a stone's throw away from Wembley Stadium, this contract was a top class performance from our team from design through to installation. We provided 450 complete balcony units that were fabricated and assembled off site and then lifted in to position when the outer building fabric was complete. We designed and supplied the cast-in connection brackets for installation as the building went up and then stored the completed balconies for call off as required.